Part of CSMIA’ s comprehensive monsoon contingency plan
MUMBAI, May 7 (The CONNECT) – Chhatrapati Shivaji Maharaj International Airport (CSMIA) has scheduled its annual pre-monsoon runway maintenance for May 8,2025, between 1100 hrs and 1700 hrs. During this time, both the primary runway 09/27 and secondary runway 14/32 will be temporarily non-operational. As part of CSMIA’ s comprehensive monsoon contingency plan, a Notice to Airmen (NOTAM) was issued six months in advance to notify airlines and stakeholders, enabling airlines to adjust their flight schedules well ahead of time. enabling them to plan appropriately.
This annual pre-monsoon maintenance is crucial for preserving the health and longevity of CSMIA’s expansive airside infrastructure, covering 1,033 acres. Specialists will inspect runway surfaces for wear and tear, addressing preventive measures for waterlogging to ensure safe landings and take-offs during the monsoon season. CSMIA also leverages advanced technology to monitor the entire maintenance process, ensuring timely execution within the designated six-hour window.