spot_img
HomeBusinessAviationPost Monsoon, Mumbai Runways Perfectly Fit

Post Monsoon, Mumbai Runways Perfectly Fit

CSMIA completes post Monsoon checks more than 5,000 aeronautical ground lights, drainage pits, chambers and critical cables used for lighting, IT and navigational aids

MUMBAI, Oct 17 (The CONNECT) –  Chhatrapati Shivaji Maharaj International Airport (CSMIA) completed its annual post-monsoon runway maintenance between 1100hrs and 1700hrs oday. The comprehensive maintenance work was implemented on both runways—RWY 09/27 and RWY 14/32. After six hours of dedicated work, CSMIA resumed regular operations.

The annual post-monsoon maintenance routine pre-emptively inspects and addresses surface degradation brought on by the rains, restoring the infrastructure to enable the highest safety and operational standards.

Key maintenance activities included the installation of runway edge lights at the intersection of runway 14/32, clearing debris from underground ducts running beneath runway 09-27, strength validation of the Runway End Safety Area (RESA) for runways 09 and 27, and extensive repair work at runway intersections.

The team inspected more than 5,000 aeronautical ground lights, drainage pits, chambers and critical cables used for lighting, IT and navigational aids. Engineering and airside teams inspected runways for surface texture and signs of erosion, attending to all necessary repairs during the scheduled closure.

The successful completion of this year’s maintenance readies CSMIA to uphold passenger safety and operational efficiency.

 

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular